Be wary of duplicated work and its potential concealment beneath different deliverable names. A presentation and a written report can both have their own owners while two people work independently on the same comparison table. Explicit handoffs will miss this kind of duplication as nobody is aware that they are taking over somebody else’s work.
@nina_x’s distinction between helping and owning makes sense. I’d keep that, but check whether your deliverables share unfinished inputs. If they do, assigning ownership only at the deliverable level leaves a gap. Someone needs responsibility for the shared input, while the deliverable owners remain responsible for how they use it. That’s a different boundary from deciding who edits next.
For example, if a proposal and an internal briefing both need to make the same set of assumptions, turn this into a shared task rather than concealing the work to generate and capture these assumptions inside both deliverables. The owner of the proposal can request a change or flag a problem with the assumptions without initiating a competing set, and taking over the assumptions task does not make whoever does so the owner of either document.
There is no need to capture every relationship in the project. I would factor out a shared task only for an output that is used in more than one deliverable and requires judgment or substantial work to generate. A common heading style probably does not need an assignment, but a comparison that all users of the document must agree on likely does. Indicate the relationship on each dependent task with a short note such as ‘Uses the assumptions task; waiting on the cost basis.’
This also affects the interpretation of ‘pick up an unfinished work’. Before continuing an unfinished deliverable, determine whether the missing work should have been part of the task or generated inside the document. If the former, contribute or take over the shared task and follow the agreed upon handoff rule; do not make changes that complete the task as if they belong inside your private deliverable just to unblock your own process. If you require a temporary assumption to continue working, make it clear that this is a provisional addition that should not be adopted as an official answer.
The most annoying edge case of this pattern is a shared input that is changed without the knowledge of those who used it. I would make the notification of change part of the dependent task, letting those who used the output decide whether they need to make changes of their own. This way, the manager of the shared task does not need to examine every document that uses its output, and users are not allowed to assume that they can see every change as they would if the shared task was part of their own document.
Before adding a new coordination role, scan the existing assignment list for opportunities to factor out common research, calculation, or decision tasks. These are often present even in well-structured assignments, and will produce benefits even if every ownership transfer is captured in assignments.